Monte Carlo Drawdown Recovery Projector

5,000-path GBM simulation — probability distribution of full recovery time from a current drawdown. Adjust depth, return assumption and volatility, or pick a scenario preset.

Simulation Inputs
Current Drawdown 15.0%
Ann. Return (μ) 10.0%
Ann. Volatility (σ) 18.0%
—
Median Recovery
trading days
—
P25–P75 Range
interquartile (days)
—
P(recover in 1 yr)
probability
Recovery Time Distribution
📊
Compute to see distribution
Recovery Path Fan Chart
🔎
Compute to see sample paths
Recovery Probability by Timeframe
Timeframe Trading Days P(Recovery)
⏳
Awaiting computation
GBM: S(t+1) = S(t) · exp((μ − σ²/2)·dt + σ·√dt·Z), dt = 1/252, Z ~ N(0,1) via Box-Muller. 5,000 paths per compute. Recovery = first day price returns to 100% of prior peak. Methodology: drawdown-recovery-simulation-2026-10-04-v2.